Services

Grid connections and compliance

Grid connection applications and compliance support: G99 for distribution-connected generation, Grid Code for transmission-connected projects, from first application to compliance evidence.

The problem this solves

A connection is won or delayed on the quality of its application and supporting evidence. Developers and operators need applications that are right first time, studies that satisfy the network operator, and a clear route through G99 or Grid Code compliance, depending on where the project connects.

Project types we support

  • Generation connections, including renewables, hydropower and BESS
  • Demand connections for industrial sites and data centres
  • IDNO network connections and adoptions
  • Transmission-connected projects

Design, calculation and study work

  • Connection feasibility and options assessments
  • G99 compliance assessments for distribution-connected generation
  • Grid Code compliance support for transmission-connected projects
  • Supporting load flow, fault level and protection studies
  • Connection application preparation and technical liaison

Deliverables

  • Connection applications with complete technical schedules
  • G99 or Grid Code compliance documentation and witness test support
  • Study reports formatted for network operator review
  • Technical responses through the application and offer process

How this reduces risk

A technically complete application avoids the rejection and resubmission cycles that cost months. Compliance evidence prepared alongside the design, rather than after it, protects energisation dates and the revenue that depends on them.

Why appoint Saqib Engineering

We speak the language of the network operator because we design to their specifications. Applications and compliance submissions are prepared by engineers who understand what the reviewer needs to see.

Common questions

What is the difference between G99 and Grid Code compliance?
EREC G99 governs generation connecting to distribution networks, which the DNO or IDNO operates. Transmission-connected projects demonstrate compliance with the Grid Code instead. We prepare the right evidence for the network the project actually connects to, rather than applying G99 across the board.
Do you support BESS grid connections?
Yes. Battery energy storage connections to the distribution network are covered by EREC G99, and we prepare the compliance assessments, studies and application evidence a DNO expects for a BESS grid connection.
What studies does a G99 connection application need?
Most G99 applications are supported by load flow, fault level and protection studies, together with compliance assessments against the connection requirements. We prepare these as one coherent package so the network operator can accept the application without repeated resubmission.

Grid connections & compliance

Send the outline of your grid connections & compliance scope: voltage level, environment and programme. A specialist engineer will reply with a clear next step.

Submit a study enquiry